Skip to content
Bunder Mobility — veicoli elettrici professionali

Electric or fuel? What does your work really cost?

Compare eCargo operating costs with petrol or LPG: enter mileage, consumption, energy prices and maintenance for a tailored estimate.

Compare costs based on how you work.

Three simple steps to simulate costs for an electric vehicle and a fuel-powered one. Enter your data, adjust usage assumptions and compare energy, fuel and maintenance.

  1. Usage: daily mileage and years in service.
  2. Electric vehicle: energy consumption, electricity cost and maintenance.
  3. Fuel vehicle: fuel type, consumption, fuel price and maintenance.

Estimated annual mileage: 8,800 km

Complete the three steps and press “Calculate” on the last one to see the comparison.

The next step is finding the right vehicle.

Review your results and see which eCargo electric tricycle best fits your operations. Bunder Company helps you choose the model, battery and configuration that match your needs.

FAQ

Why does the calculator ask for electric consumption in kWh/100 km?

kWh/100 km is the energy needed to travel 100 km. For a realistic comparison with petrol, diesel or LPG, the electric figure should reflect grid energy including charging losses—not only what the battery delivers.

Does this calculate full total cost of ownership (TCO)?

No. It compares energy or fuel and maintenance costs over your selected period. It does not automatically include purchase price, financing, insurance, charging infrastructure, possible battery replacement or residual value. The output is an operating-cost estimate, not full TCO.

Which consumption and price defaults are used?

The tool starts with editable illustrative values. Electric: 11 kWh/100 km (grid, with charging losses) and €0.25/kWh; reference eCargo with 72 V 125 Ah LiFePO4 pack, 80–100 km stated range. Petrol: 8 L/100 km and €2.00/L. LPG: 9.5 L/100 km and €0.82/L. Fuel prices are indicative Italian MIMIT references (~9 Nov 2026); consumption figures are simulation assumptions, not certified performance. Replace defaults with measured consumption, actual energy prices and your company's contract terms.